Install 23 32 inch or thicker osb panels in the proper orientation that is with the side marked this side down facing down.
Bruce hardwood over osb.
My subfloor above grade consists of 23 32 sturd i floor osb over 24 oc joists.
Osb that has absorbed moisture on the jobsite shrinks as it dries which can loosen around nails and staples that attach the hardwood flooring.
Ensure that no fasteners are exposed or raised and that there is at least an 1 8 inch gap between osb subfloor panels.
Moisture contents of osb subflooring must be established prior to hardwood flooring installations.
Osb is fine as a subfloor structurally but imo it won t hold a nail or staple as well as spruce plywood.
In the event the moisture differential between the osb and hardwood is too great at the time of installation problems can arise.
Flooring is attached with staples to the subfloor which can be plywood oriented strand board osb high density particle board or even existing wood flooring.
A benefit to using staples over glue is that it can be walked on immediately.
Tap tongue and groove sheets together with a hammer but leave a.
I will be installing bruce unfinished 3 4 strip flooring this weekend.
Main concern is nails staples coming loose from the osb over time.
1 should i use barbed nails or staples.
Especially if you are using a stapler to install the wood.
I would not install hardwood directly over osb.
2 is there any advantage to.